Real projects, real results. See how our integrated design-build-protect model delivers for power, fertilizer, water treatment, and chemical industries worldwide.
Complete redesign and relining of a 42m distillation column for a European refinery. Upgraded internals and corrosion protection for extended turnaround cycles.
Rubber-lined leaching vessels and piping for SX-EW copper extraction. Designed for extreme abrasion from acid-ore slurry at 60°C.
12-vessel brine treatment package for a chlor-alkali plant. Combined process design, FRP fabrication, and PVDF-lined steel tanks — delivered ahead of schedule.
12 FRP vessels with rubber lining, 50K m³/day capacity, commissioned 3 weeks ahead of schedule.
Six reactors with custom EPDM compound — on track for 15-year design life after previous linings failed at 4.
Design-to-delivery for one of Southeast Asia's largest rubber-lined FGD absorbers — two towers, 18 months, zero punch list.
Let our team assess your requirements. We respond within 24 hours.